Progress tends to slow at a certain point of construction.
Drywallers were working this week and part of last week.  All the walls are up, taped, mudded and redone.  They should be done this week end, which means the painter will be in next week to spray the walls and ceilings.  Then we get to add our color splashes.. purples, neon greens, black... and the rainbows over the windows.
Just kidding.
Once painting is done, final electric work and final plumbing work gets finished and the flooring gets laid.  That includes tile work in the bathrooms and the wood flooring in the bulk of the house.  Trim would be next, followed by cabinets....or vice-versa. Could be cabinets then trim.
We are selecting colors for the garage doors and the driveway still has to be addressed.  But those are the end of the tunnel projects.
I do have a problem.  My bizarre idea of having a patio instead of a porch has created a mini problem.  Look at the picture....tell me what you think.

fireplace in family room

new dining room furniture or bathrooms...not sure

chimney for Santa

Where the patio goes....do I need a railing?  How does the land need to go?  What about a wall and a step down?
just because


Comments

Popular posts from this blog

Am I a klepto???

A first Christmas in the new house

For Auld Lang Syne, my dear